• Quality
  • News
  • Careers
    • Back
    • Why Choose Radley
    • Current Vacancies
+353 (0)58 41199
  • Home
  • About Us
    • About Us
    • Our Company
    • Company History
    • Meet The Team
    • Health and Safety
    • Quality
    • Case Studies
  • Sectors
    • Pharmaceutical/Bio-Pharma
    • Industrial Manufacturing
    • Oil and Gas
    • Power Generation/Utilities
    • Food and Beverage
    • Medical Technology
    • Semiconductor
    • Architecture
  • Capabilities
    • Mechanical Piping
      • Carbon Steel Piping
      • Stainless Steel Piping
      • High Purity Piping
    • Vessel Fabrication
      • Stainless Steel Vessels
      • Carbon Steel Vessel
      • Exotic Materials of Construction
    • Modular Construction
    • Architectural Metal Work
    • Specialist Fabrications
      • Jacketed Vessels
      • Process Columns
      • Heat Exchangers
      • Other Fabrications
  • Expertise
    • Design
    • Welding & Machining
    • Testing
    • Degreasing, Cleaning and Passivation
    • Vessel Repair & Refurbishment
  • Contact Us
Radley Engineering, Co. Waterford, Ireland
  • Home
  • About Us
    • About Us
    • Our Company
    • Company History
    • Meet The Team
    • Health and Safety
    • Quality
    • Case Studies
  • Sectors
    • Pharmaceutical/Bio-Pharma
    • Industrial Manufacturing
    • Oil and Gas
    • Power Generation/Utilities
    • Food and Beverage
    • Medical Technology
    • Semiconductor
    • Architecture
  • Capabilities
    • Mechanical Piping
      • Carbon Steel Piping
      • Stainless Steel Piping
      • High Purity Piping
    • Vessel Fabrication
      • Stainless Steel Vessels
      • Carbon Steel Vessel
      • Exotic Materials of Construction
    • Modular Construction
    • Architectural Metal Work
    • Specialist Fabrications
      • Jacketed Vessels
      • Process Columns
      • Heat Exchangers
      • Other Fabrications
  • Expertise
    • Design
    • Welding & Machining
    • Testing
    • Degreasing, Cleaning and Passivation
    • Vessel Repair & Refurbishment
  • Contact Us

Sectors

Radley Engineering Logo
CONTACT
Radley Engineering Limited,
Killadangan,

Dungarvan,
Co. Waterford,
Ireland

Tel: +353 (0)58 41199
Fax: +353 (0)58 42169
Quicklinks:
  • Mechanical Piping
  • Modular Construction
  • Oil and Gas
  • Vessel Fabrication
  • Architectural Metal Work

Start typing and press Enter to search

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary
Always Enabled

Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.

Non-necessary

Any cookies that may not be particularly necessary for the website to function and is used specifically to collect user personal data via analytics, ads, other embedded contents are termed as non-necessary cookies. It is mandatory to procure user consent prior to running these cookies on your website.

M.S.D. Ballydine

Including:

  • Actuated Valves,
  • Instrumentation,
  • Pumps,
  • Glove Box
  • Platform, Handrails & Stairs
  • Electrical Installation

Pressure Vessels

  • 2 No. (1000 & 500 Ltr)

With:

  • Agitator
  • Spray balls
  • Insulation
  • Cladding
Intel

intel-module-3

Site Location: Lexlip, Dublin
Duration: 4 Years, 6 Projects Completed
Project: IR1 to Fab 10 Pipe-racks
Project Manager: JACOBS ENGINEERING
Duration: 12 Months Phase 1 & 2
Value: € 4.6 Million, Average/Peak Manpower 28/72
Scope:

  • Supply, Fabrication, Delivery, & Erection of Prepopulated off site Pipe Rack Modules. 1.2 Kilometres of Structural Racks to Transport OFA, CHW, TCHW, and PCW on site
  • All associated Pipe-work, Structural Steel, Electrical, Painting, Scaffolding, NDT, Insulation, Equipment Installation and Valves/Instruments (Free Issue)

1. IR1 to Fab 10 Pipe-racks

Project Manager: JACOBS ENGINEERING
Duration: 12 Months Phase 1 & 2
Value: € 4.6 Million, Average/Peak Manpower 28/72
Scope:

  • Supply, Fabrication, Delivery, & Erection of Prepopulated off site Pipe Rack Modules. 1.2 Kilometers of Structural Racks to Transport OFA, CHW, TCHW, and PCW on site
  • All associated Pipe-work, Structural Steel, Electrical, Painting, Scaffolding, NDT, Insulation, Equipment Installation and Valves/Instruments (Free Issue)

2. BB-09 Link Corridor

Project Manager: M & W Group
Duration: 18 Months
Value: € 4.5 Million , Average/Peak Manpower 21/56 Craft
Scope:

  • Supply, Fabrication, Delivery, & Install Pipe-work and Equipment to Link Corridor between FAB 14 & FAB 24

3. Tool Install FAB 14 & 10

Project Manager: INTEL/DPS
Duration: 22 Months
Value: € 4.6 Million, Average/Peak Manpower 75/212 Craft
Scope

  • Supply, Fabrication, Delivery, & Install Process & Mechanical Pipework to tools locatd in FAB 14 & FAB 10.

4. FAB 14 Bulk Gas Yard installation

Project Manager: Air Products
Duration: 7 Months
Value: € 1.1 Million, Average/Peak Manpower 16/34
Scope:

  • Supply, Fabricate & Erect of Piping & Equipment to Air Products Gas Separation Plant
  • HVAC, Insulation, Carnage, Scaffolding, Equipment Installation.

 

5. Tool De-Install FAB 24

Project Manager: Intel/DPS
Duration: 6 Months
Value: € ½ Million, Average/Peak Manpower 12/23
Scope:

  • DeInstall of Process & Mechanical Pipework to tools in FAB 24 to prepare for 1272 Upgrade

6. Bulk Gas Mechanical Skids FAB 10

Project Manager: Air Products
Duration: 4 Months
Value: € 230K, Average/Peak Manpower 12/22
Scope:

  • Supply & Fabricate offsite of High Purity Skids in our Cleanroom Facilities. Delivery & Install Onsite Including Hookup Testing and qualification in accordance with Intel & AMTS specification
Merc Sharpe & Dohme

Site Location: Carlow, Ireland
Fabrication: All completed at Radley Engineering Workshop, Dungarvan.
Client: Merc Sharpe & Dohme.
Market Sector: Pharma
EPC: Project Management
Value: € 10 Million
Schedule: 8 Months (16,000 Mtrs Pipe)
Man Loading: 110 (Including Sub Contractors)
Scope:

  • 17,000 Mtrs Pipe in 133 Modules
  • Installation of Boilers, Vessels, Heating & Cooling Skids
  • Vacuum Pumps, Compressors, Pumps etc.
  • Fabrication, Installation and hook up of 133 Pharmadule Modules.
  • All associated Pipe work including clean systems
Regeneron Project

Site Location: Limerick, Ireland
Fabrication: All completed at Radley Engineering Workshop, Dungarvan.
Client: Regeneron.
Market Sector: Pharma
EPC: Project Management
Value: € 15 Million (+)
Schedule: Ongoing – On Site 18 Months (6-8 Months Left)
Man Loading: 110 (Including Sub Contractors)
Scope:

  • 22,000 Mtrs Pipe.
  • Associated Equipment & Platforms
  • NDT
  • Insulation & Painting of Pipework & Modules
  • Equipment Installation
Glanbia

Site Location: Waterford, Ireland
Fabrication: All completed at Radley Engineering Workshop, Dungarvan.
Client: Glanbia.
Market Sector: Food Ingredient Processing
EPC: Project Management
Value: € 5 Million
Schedule: 11 Months
Man Loading: 80 (Including Sub Contractors)
Scope:

  • 16,000 Mtrs Pipe.
  • Associated Equipment & Platforms
  • NDT
  • Insulation & Painting of Pipework & Modules
  • Equipment Installation